Q1Do you need KNPC or KOC registration to supply Kuwait?
Direct supply to KNPC or KOC needs registration as an approved vendor, which is time-limited, must be renewed, and for foreign firms requires a local agent.[4] Most imported pipe reaches Kuwait through a registered contractor or local agent; we supply to their purchase specification and documentation requirements.
Q2Which materials are used in hydroprocessing units?
Hot hydrogen service runs in Cr-Mo such as P22 and stabilised H-grade stainless such as SS 321H and SS 347H, chosen per API RP 941 and the licensor's specification. See H grades for high temperature.
Q3How big is Kuwait's refining system?
Reported design figures: Al-Zour 615,000 b/d, and Mina Abdullah and Mina Al-Ahmadi upgraded under the Clean Fuels Project to roughly 800,000 b/d combined.[1][2] Together that is about 1.4 million b/d, all of which needs maintenance and turnaround material.
Q4Which ports serve Kuwait?
Shuwaikh Port near Kuwait City for containers, and Shuaiba Port south of the city next to the refinery and petrochemical belt.
Q5Can you supply turnaround material on a fixed date?
Yes, if the list reaches us early enough to produce mill items. Stock items ship after inspection; we confirm each mill item's lead time on the quotation and track it to your turnaround date.